This week we got most of the second floor electrical done (rest has to wait until we get some interior walls in), some of the second floor insulation, front porch ceiling, started electrical room (the platform on the side of the building). I also included a pic of my water barrels ( I have 5 so far).
[galleryview=id:11;]