So summer finally arrived today… 85 might not be hot to some but to me working in the sun today after a sumer of days in the 60’s and 70’s… ugggg…. but I can’t complain…. two days in a row without rain…
7-27-2009
After way to much rain we got back to the cabin today. Stopped by the Amish sawmill and picked up most of the 1×10’s we needed… they were running short so we are scrounging around our place for some extras… We also stopped by the Amish Steel roofing guy… picked up the roofing from an order he had returned that was the wrong color. It was close enough for us…
7-18-2009
The weather report called for scattered rain today… evidentially all scattered around us….
Continue reading 7-18-2009
7-13-2009
So today we got the platform done and three walls up…. the truly fun part was getting the 2×6 floor down… we used some recycled 2×6’s for the flooring… but the lengths were a little short for normal 16 inch on center framing… did not think to check it out before… so we had to do lots of cuts the fit the puzzle together…
7-12-2009
We started on the wood shed today… going back tomorrow to finish (or get as far as we can… We would have progressed further but I messed up the wood order and did not have enough floor joists… on the plus side HD messed up and I got a little extra wood…